August 2012
Michael was retained by the owners, for a further stage of studies of a Vietnamese nickel plant upgrade.
Paul conducted an inspection of pipeline to assess the workmanship to ASTM A333 Grade 6 on behalf of MRC SPF and the Mortlake Gas pipeline connection project.
Michael was elected the President of the Institute of Refractory Engineers – Australian Chapter.
Paul and Fred completed a metallurgical condition assessment of a Fosters group brewing vessel.
Paul continued support to BHP Billiton Petroleum’s Macedon Project with time offshore on the McDermott Derrick and Pipelay Barge 30.