November 2007
Refmet was awarded a design assistance assignment by Unimin P/L for the strategic upgrade of their Shaft kiln linings throughout Australia.
As part of his ongoing shutdown planning assistance to Nyrstar Hobart, Michael visited the site of Siam Refractories near Saraburi in Central Thailand, to inspect the latest consignment of bricks, prior to despatch to Tasmania.
Paul has commenced the third party validation of all of the Safety Critical Equipment to be used as part of the BHP Billiton Chinook-1 completion equipment. Paul has made several visits to the work shops of Helix Well Operations in Jandakot, W.A to witness testing of riser piping, flow-heads and running tools.