May 2011

Written by admin on . Posted in News

RefMet condusted a materials engineering support contract with BHP Billiton Petroleum for their Macedon Development fosusing on third party inspection of drilling tools.

Fred conducted some in-service inspection and supervision of piping / instrument modifications for the Integro Foods facility in West Footscray, Victoria.

RefMet commenced an inspection assignment for PTTEP Australasia.  The assignment involves the refurbishment of running tools to be used in the De-completion of the Jabiru and Challis fields.  This work is being managed by Paul and assisted by Howard, and involved some welding procedure reviews of drill riser equipment.

© RefMet 2011