April 2011

Written by admin on . Posted in News

RefMet is pleased to announce that Fred Plater joined RefMet on a permanent basis.  Fred joins RefMet with an extensive welding, in-service inspection, quality assurance, and fabrication capability.  More details are provided in the Personnel section.

RefMet have again been retained by BHP Billiton Worsley Alumina, this time for their #4 Calciner shutdown planned for early October 2011.

RefMet assisted Renewable Metal Technologies (rmt) with shutdown planning and inspection services at their new Wagga Wagga lead-acid battery recycling facility.

© RefMet 2011