September 2010
Paul was off to Singapore for Esso to discuss the progress of the Kipper Tuna projects pipeline welding Engineering Criticality Assessment with DNV.
RefMet’s involvement in third party verification of drilling tool refurbishment at Cameron’s Melbourne workshop, for BHP Billiton Petroleum’s Macedon Project came to an end with the last tool being successfully delivered to the client.
Michael conducted his one day Refractories Engineering training seminar ‘in-house’ for Pyrotek Inc at their Sydney facility.