July 2010

Written by admin on . Posted in News

RefMet began an ad-hoc third party role with BP Angola drilling tools at Cameron’s Melbourne workshop.

RefMet was retained by Redbank Power to assist in strategic planning for future Boiler lining repairs, beginning with the shut planned for April 2011.

© RefMet 2011